Over 50,000 Brand New, 100% Genuine PLC/PAC & DCS Products!

Honeywell C200/C300 Series/Honeywell/

Honeywell 51304584-200 Panel-Mount I/O Interface Board

Brand:Honeywell
Part Number:51304584-200
Product:Panel-Mount I/O Interface Board
Origin:United States
Payment: T/T, Western Union
Price: USD 99
Dimensions: 180 x 70 x 55 mm
Weight: 0.5 kg 
Warranty: 12 months

  • Product Details
  • Datasheet

The 51304584-200 panel-mount I/O interface board routes field signals between Honeywell controllers and panel-mounted devices. Integrators prefer this board for its compact layout and clearly labeled terminals. Furthermore, the assembly supports mixed signal types within a single mounting footprint.

Key Technical Specifications

The 51304584-200 measures approximately 30.5 cm in length and 20.3 cm in width. Moreover, it weighs roughly 0.7 kg, which suits standard enclosure backplate mounting. The board accepts field wiring through screw terminals and connects to the controller via a backplane ribbon interface.

Parameter Specification
Brand Honeywell
Model 51304584-200
Category Panel-Mount I/O Interface Board
Dimensions ~30.5 × 20.3 cm
Weight ~0.7 kg
Input Channels 16 analog inputs
Output Channels 8 digital outputs
Interface Ribbon cable to controller, screw terminals to field
Energy Storage Onboard bulk capacitors
Operating Temperature 0 °C to 60 °C

Interface and Terminal Layout

Screw terminals accept standard field wiring and speed up routine maintenance. Each input channel supports 4–20 mA or 0–10 V field signals. Additionally, labeled terminal blocks reduce wiring errors during panel assembly. The ribbon interface carries channel data directly to the host controller.

Component Count and Energy Storage

The 51304584-200 contains roughly 220 discrete components on a single PCB assembly. Consequently, the board consolidates signal conditioning and minimizes inter-module wiring. Onboard bulk capacitors store enough energy to ride through brief supply dips. Therefore, the board holds stable readings during transient disturbances.

Installation and Commissioning

Technicians mount the board on the enclosure backplate with four fasteners. You should verify terminal torque values before energizing the system. Afterward, run a channel calibration routine through the controller software. Finally, document baseline readings for future predictive maintenance comparisons.

Prev:

Next:

Chat Send Inquiry